Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Oct 22 16:51:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    25 Blog Entries  next>>
Info Update
1901 views
0

Oct 10 2019 (19:44)  
Ranjeet~
Ranjeet~   213 blog posts
Entry# 4454220               Past Edits
Why railway connectivity in Jammu and Kashmir is such a challenge
The biggest challenges of the Jammu and Kashmir railway project are geographical. The alignment passes through major geological thrust zones in the region
Union railways minister Piyush Goyal had announced the NDA government’s plans of providing rail connectivity from Kashmir to Kanyakumari by 2022 at the inauguration of the Vande Bharat Express.
Vande
...
more...
Bharat, the train from New Delhi to Katra, is the Centre’s first big infrastructure project in Jammu and Kashmir after the abrogation of Article 370.
The government plan involves a 272-km long rail line from Udhampur to Baramulla joining the Kashmir valley with the railways network under Udhampur-Srinagar-Baramulla Rail Link project (USBRL). The 111-km-long railway stretch between Katra and Banihal, currently under construction, will connect the Kashmir Valley with the rest of the country.
Train services have been operational between Banihal and Baramulla in the Valley since 2013. Services on this line connecting Kashmir to Jammu have been suspended since August 5, according to senior railway ministry officials.
“The railway line from Delhi right now goes up only to Katra. After that we have a railway line from Banihal to Baramulla. Between Katra to Banihal work is going on and it is the railways’ most challenging project undertaken post-Independence. The alignment of USBRL involves construction of a large number of tunnels and bridges in highly rugged and mountainous terrain with most difficult and complex Himalayan geology,” Rajesh Agrawal, Divisional Railway Manager (DRM) Firozpur said.
The Katra- Banihal section includes 38 tunnels of 163 km (97 km main tunnels and 66 km of escape tunnels), 927 bridges and 203 km of access roads. The total approved cost of the project is Rs 27,949 crore, of this the sanctioned cost of Katra-Banihal section is Rs 21,653 crore. According to the railways ministry, the cumulative expenditure on this section up to September is Rs 13,285 crore (i.e. 61%).
Work on the Katra-Banihal railway line is being undertaken by two Indian Railways public sector undertakings (PSUs)— Konkan Railway Corporation Limited (KRCL) and IRCON— under the supervision of the Northern Railways zone.
Of the total length of 272 km, work has been completed on 161km stretch. Ministry officials said almost 60% work has been finished in the Katra-Banihal section.
The section includes eight stations out of which five lie in Reasi district (Reasi, Salal, Dugga and Basindadhar) and three in Ramban district (Sangaldan, Sumber and Arpinchala).
This challenging project runs across the deep gorge of the Chenab river near Salal hydropower dam. The 359 meter high and 1315 meter long Chenab bridge is being constructed here in the Seismic Zone V. Upon completion it will be the bridge in the world. Currently the world’s tallest rail bridge is located over France’s Tarn river.
The project due to its geological challenges was sub-divided in three phases— Quazigund-Baramulla (118 km) and Banihal-Quazigund (18 km) which was commissioned in June 2013, Udhampur to Katra (25 km) commissioned in July 2014 and Katra to Banihal scheduled to be completed in March 2021.
At the inauguration of the Vande Bharat Express, home minister Amit Shah said Jammu and Kashmir will lead the country in terms of development over the next decade.
The task of completing Udhampur-Srinagar-Baramulla Rail link Project (USBRL), however, has many challenges.
Major challenges
The biggest challenges of the project are geographical. The alignment passes through major geological thrust zones in the region Reasi and Muree, and one major fault Sangaldan.
A fault is a crack in the Earth’s crust. Typically, faults are associated with, or form, the boundaries between tectonic plates and are more susceptible to earthquakes.
The geological strata vary from loose conglomerate, clay, silt stones, crushed and faulted sand stones and dolomites.
“Geology changes very frequently along the alignment and it is very difficult to access the complete geology in advance. Hence, as the work progresses adjustments in design have to be made. Construction of longer tunnels and wider cross section for station yards is a difficult task. Extensive engineering works are required to be done for tunnel portals, deep cuttings, bridges and approach roads,” a senior official involved with the project said on condition of anonymity.
The tunnel portals along the route fall on the steep, inaccessible and challenging hilly terrain. “Most of the sites are inaccessible, we have constructed a 200 km approach road. Another problem is extreme weather conditions, the area is prone to heavy rainfall and snowfall,” the official added.
More than 200 km of approach roads have been constructed in so far, including a tunnel, 320 bridges (25 Bailey bridges and one road bridge) to reach the working sites.
Construction of wide network of access roads has provided connectivity to far flung areas, according to officials.
“The approach roads connect surrounding villages. Earlier, the access to these villages was through footpaths or by boats. These roads are facilitating the development works by other government departments,” the official added.
Security risks
Railways has maintained a close liaison with the state government. “Law and order problems of J&K have impacted the project. We have had to suspend operations many times. Repeated PILs in the high court have also affected the project adversely from 2008 to 2016,” the official added.
At present, services from Banihal to Baramulla have been suspended since the repeal of Article 370.
“We have evacuated nearly 60,000 people, mostly students from National Institute of Technology, Srinagar, Jammu and Udhampur in the initial days. People have to come to Katra by state transport buses and then move to other parts of the country. We are ready to resume services anytime but it is subject to clearances,” DRM, Ferozepur, Rajeev Aggarwal added.
The existing stations in the operational Banihal-Baramula section are Banihal, Shahabad Halt, Qazigund, Sadura, Anantnag, Bijbehara, Panjgam, Awantipora, Kakapora, Pampore, Srinagar, Budgam, Mazhom, Pattan, Hamre, Sopore and Baramulla.
15 pairs of diesel–electric multiple unit (DEMU) services ply on this section providing all-weather connectivity. “Additional DEMUs were introduced in July 2015 and later fast DEMUs for convenience of office-goers and students were put into service in May 2016 between Banihal-Baramula and Baramula-Budgam,” the official said.
The railways have decided to deploy a special unit—Commando for Railway Security (CORAS)—across sensitive stations along the Jammu-Pathankot line for the commercial run of the Vande Bharat Express.
Current project status
Tunneling has been complete in 114 km. The tunnels will be equipped with modern state of art ventilation and public address system.
“Provision has been made for a parallel escape tunnel as per international standards, connecting with the main tunnel with cross passages at regular intervals to facilitate rescue in case of emergency,” the official quoted above said.
Railways has earlier constructed the 11.21 km-long ‘Tunnel T-80’ in this region which is the longest transportation tunnel in Asia. Another tunnel is being constructed on Katra-Banihal section T-49 (12.75 km) which will be even longer than T-80.
Out of the 37 bridges on the Katra-Banihal section, 19 have been completed.
“Bridge 39 is an engineering marvel with high, rectangular, tapered hollow piers, spanning about 490 metres and Reasi station yard located over it. About 7000 million tonnes of reinforcement steel and 6700 million tonnes of structural steel has been used. This iconic bridge will stand 38 metres taller than the Qutub Minar,” the official quoted above said.
The project required a total of 1845 hectares of land of which 1808 hectares have been acquired. “The remaining 37 hectares are primarily required for muck dumping, additional land near some of the tunnel portals and approach roads. Main project work is not getting affected on this account,” the official added.
The project also required diversion of 532 hectares of forest land which the Northern Railways has completed.

Translate to English
Translate to Hindi
Travelogue
727336 views
10

Oct 29 2018 (11:52)   74637/Banihal - Baramula DEMU | SINA/Srinagar Kashmir (3 PFs)
udyanabhatufan~
udyanabhatufan~   627 blog posts
Entry# 3948890            Tags   Past Edits
Video Link : click here
"Agar firdaus bar roo-e zameen ast, Hameen ast-o hameen ast-o hameen ast"
This is a famous Persian couplet by a sufi mystic, poet, composer and musician Amir Khusro belonging to medieval period which means......
"IF THERE IS PARADISE ON FACE OF THE EARTH,
IT
...
more...
IS THIS, IT IS THIS, IT IS THIS (KASHMIR INDIA)"
And truly this Video says the same.
Enjoy the magnificent and the most beautiful Railway network abode Indian Railways comprising of Inida's Longest Railway Tunnel (Pir Panjal Tunnel ) of 18 KMS and a hell lot of sceneric backdrop of hills.
Do watch the message from the people of Kashmir,Beautiful Banihal Station,Srinagar Station, Trains crossing enroute,enroute stations,snow covered mountains and hell lot of other things...!!!
Do subscribe if you like my work..!!!
Thanks.
#glimpseofindianrailways
#kashmir #srinagar #indianrailways #kashmirrailways #jannatekashmir #swachbharat #shreshtrabharat #northernrailways #demu #train #beautiful #sceneric #banihal #baramula #hills #himalaya #curve #snow #mountains #valley #kashmirvalley #trainset18 #TS18 #anantnag #pampore #shahabad #quazigund #diamondcrossing #curve

Translate to English
Translate to Hindi

1 Public Posts - Thu Mar 28, 2019

1 Public Posts - Sun May 26, 2019
1 Followers
Rail Fanning
120549 views
7

Feb 15 2016 (22:16)   75208/Muzaffarpur - Samastipur DEMU (Via Sitamarhi) | GARA/Garha (2 PFs)
 
guest   4394 blog posts
Entry# 1739937            Tags  
*** On This Date in History! *** 7 Years Ago Today at ECR ! ***
As per latest news from ECR, Sitamarhi, new BG line from Sitamarhi to Garha (Sitamarhi-Muzaffarpur new broad gauge line project) will be opened for passenger traffic on 15-Feb-2009!
Also, gauge conversion work on Sitamarhi-Bairganiya and Sitamarhi-RunniSaidpur sections will be completed by Mar-2009!
Reference / Source : IRFCA News Posted
...
more...
by Me at that time!

Translate to English
Translate to Hindi

1 Public Posts - Mon Feb 15, 2016

37002 views
4

Feb 15 2016 (22:22)
guest   4394 blog posts
Re# 1739937-2              
*** On This Date in History! *** 7 Years Ago Today at NR ! ***
NR : Baramulla-Anantnag Passenger Flagged Off!
Anantnag-Budgam BG line was opened in Oct'08. Now, Budgam-Baramulla BG line was opened for passenger traffic. Inaugural Special Passenger ran from Baramulla to Mazhom. Regular direct services between Baramulla and Anantnag will start from 15-Feb-2009! The stations en-route are: Baramulla, Sopore, Hamre, Pattan, Mazhom, Budgam, Srinagar, Pampore, Kakapora, Awantipora, Panjgam, Bijbehara and Anantnag. Anantnag-Quazigand BG line will be completed in next 4 months.
Translate to English
Translate to Hindi
General Travel
52604 views
43

★★★
Dec 26 2014 (19:10)   PMPE/Pampur (2 PFs)
 
Dinesh Singh~
Dinesh Singh~   1376 blog posts
Entry# 1321137            Tags   Past Edits
Winter Hues
Photographing on a foggy morning near Pampore, India, Your Shot member Sajad Rafeeq waited half an hour for a passing train to complete his composition. “I had reached a village and a few kids guided me to a canal,” Rafeeq writes. “It’s surrounded by poplar trees on both sides, and as soon as I reached it, I saw their beautiful symmetry and also spotted the railway bridge. I framed the composition while having in mind the train that had yet to come.”
.
.
...
more...

.
click here
by: Mr. Sajad Rafeeq

Translate to English
Translate to Hindi

4 Public Posts - Fri Dec 26, 2014

3 Public Posts - Sat Dec 27, 2014
Race Blog
8517 views
6

May 04 2014 (16:52)   12394/Sampoorna Kranti Express (PT) | NDLS/New Delhi (16 PFs)
 
vijeshk_^~
vijeshk_^~   32790 blog posts
Entry# 1083632            Tags   Past Edits
********* Sunday Mania with SK ********
SK Fans are invited to board in Red Snake to have a blistering run to Patna........
Duty Chart :-
.
LP ------ MKS
ALP
...
more...
------ Vijesh K (myself)
TLP ------Abhishek Vats.
OSD ------ Rohit Kumar
Guard ----- Franz Reuleaux
.
Time - 16:52
Awaiting to Departure.........

Translate to English
Translate to Hindi

80 Public Posts - Sun May 04, 2014

50 views
0

May 04 2014 (23:00)
vijeshk_^~
vijeshk_^~   32790 blog posts
Re# 1083632-81              
PAMPORE (PMPR)
22:57 ( 31m early )
Translate to English
Translate to Hindi

125 views
0

May 04 2014 (23:00)
MKS^~   24659 blog posts
Re# 1083632-82              
Xed Pampore At flat 120 kmph.
SK:- Departed from PAMPORE (PMPR) at 04-May 22:57 No Delay (530 Kms. to go)
Translate to English
Translate to Hindi

73 Public Posts - Sun May 04, 2014

122 Public Posts - Mon May 05, 2014

3 Public Posts - Thu May 08, 2014

1 Public Posts - Fri May 09, 2014
Page#    25 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy