Khagaria - Alauli - Kusheshwar Sthan Rail Line Project
18 KM/42 KM
First Report :
10/10/2018Second Report :
07/05/2019 Khagaria - Alauli - Kusheshwar Sthan New Rail Line Project.
(KGG - KSS)
(Single Line With Electrification)
Total 8 Station. | 42 KM
1. Bishanpur
2. Kamathan
3. Alauli Garh
4. Chera khera
5. Shaharbanni
6. Tilkeshwar Halt
7. Sughrain
8. Kusheshwar Sthan Jn
ЁЯФ╖я╕П Approved :- 1998
ЁЯФ╖я╕П First Dead Line :- 2006/2009/2013/2016
ЁЯФ╖я╕П Actual Work Started :- 2007
ЁЯФ╖я╕П New Deadline :- 2020 (For 18 KM/Alauli)
Rest Unexpected.
ЁЯФ╖я╕П Cost (Previous) :- 162 Cr.
ЁЯФ╖я╕П Cost (Now) :- 544 Cr.
Connecting Line :- Hasanpur Road - Kusheshwar sthan - Sakri - Jaynagar/Darbhanga
please wait...Translate to EnglishThis sick vid about Khagaria's Alauli station is up on
YouTube.
You gotta check out this #GroundReport on IRI. It's the 3rd one and it was posted on 19/08/2020.
The video is by Prabhat Sharan and the voiceover is done by Darbhanga Rocks.
They're giving the deets on the Khagaria - Alauli - Kusheshwar Sthan Rail Line Project.
The line is 18 KM/42 KM long and consists of 8 stations:
1. Bishanpur
2. Kamathan
3. Alauli Garh
4. Chera khera
5. Shaharbanni
6. Tilkeshwar Halt
7. Sughrain
8. Kusheshwar Sthan Jn
The project was approved back in 1998 and they finally started working on it in 2007. The new deadline is 2020 for the first 18 KM near Alauli, rest is up in the air. The cost went from 162 Cr. to 544 Cr.
It'll connect Hasanpur Road, Kusheshwar Sthan, Sakri, Jaynagar, and Darbhanga.
please wait...Translate to HindiFirst Time рдЦрдЧрдбрд╝рд┐рдпрд╛ рдХрд╛ рдЕрд▓реМрд▓реА рд╕реНрдЯреЗрд╢рди
YouTube рдкрд░ред
#GroundReport 3rd Report on IRI
Dated : 19/08/2020
Video : Prabhat Sharan
Voice : Darbhanga Rocks
Khagaria - Alauli - Kusheshwar Sthan Rail Line Project
18 KM/42 KM
First Report :
10/10/2018Second Report :
07/05/2019 Khagaria - Alauli - Kusheshwar Sthan New Rail Line Project.
(KGG - KSS)
(Single Line With Electrification)
Total 8 Station. | 42 KM
1. Bishanpur
2. Kamathan
3. Alauli Garh
4. Chera khera
5. Shaharbanni
6. Tilkeshwar Halt
7. Sughrain
8. Kusheshwar Sthan Jn
ЁЯФ╖я╕П Approved :- 1998
ЁЯФ╖я╕П First Dead Line :- 2006/2009/2013/2016
ЁЯФ╖я╕П Actual Work Started :- 2007
ЁЯФ╖я╕П New Deadline :- 2020 (For 18 KM/Alauli)
Rest Unexpected.
ЁЯФ╖я╕П Cost (Previous) :- 162 Cr.
ЁЯФ╖я╕П Cost (Now) :- 544 Cr.
Connecting Line :- Hasanpur Road - Kusheshwar sthan - Sakri - Jaynagar/Darbhanga