Revised compostion of ecor trains, swr trains , lslrd added in place of eog for bvc coa snsi, speed increased in gdr manubolu third line
Note : vskp mas vskp existing composition slr -1 , eog -1 , sleeper - 9, gs -4, third ac - 3 , second ac -1 total 19 coaches, from November 29, 2 sleeper will be replaced with one third ac and second ac. So final composition : gs -4, eog -1, slr -1 , third ac -4 , second ac-2, sleeper -7 total 19 coaches