Now it is high time for BJP to give more new trains, railway projects for the most neglected parts of WB i.e. Midnapore, Bankura, Bishnupur, Purulia regions. Otherwise in 2026 assembly elections of WB the result will be more poor. In last 10 yrs these areas r totally neglected. No new trains and projects given to Adra Division of SER. The result we saw in LS Election, people want work not bhasanwazi only.
BJP MP from Bishnupur just won by margin of few votes. He atleast 2 months before LS Election took intiative to start the work of joing Bankura-Masagram route to HBC route of ER and did prachar for this work.
...
more...
1. Anara MEMU shed should be completed by Dec 2024 and more MEMU and Express trains should start in Adra division.
2. All express and Pgr trains permanently cancelled in Adra division during ZBTT 2020 should be restored back immediately. Already less trains in Adra division, SER RB permanently cancelled many trains in Adra division in the name of ZBTT 2020. Public suffering.
3. Bowaichandil-Khana New line project where 90% land is available with SER, work should be started immediately and aquisition of remaining 10% land should be tried to aquire in consultation with WB Govt and local bodies.
4. Aranyak exp extension to Bokaro should be done immediately and change in TT in return to be changed as per deputations submitted by locals publics of Adra, bankura, bishnupur, etc to previous DRM Adra.
5. Bokaro-Asansol MEMU cancelled since Covid should be restored immediately. Bankura MP from BJP had made FAKE promise to restore this train before election in his FB page self video, but not restored before election and it was a Zoomla by BJP MP. Result of zoomla is given by y public in election to him
please wait...Translate to EnglishIt's time for BJP to step up and give more trains and railway projects to the neglected areas of WB like Midnapore, Bankura, Bishnupur, and Purulia. If not, the 2026 elections in WB will not look good. These areas have been left behind for the past 10 years with no new trains or projects in sight. The people are fed up with empty talk, they want action! The BJP MP from Bishnupur barely won by a few votes, mainly because he promised to kickstart the Bankura-Masagram route to HBC route of ER. Here are some demands: 1. Finish Anara MEMU shed by Dec 2024 and start more MEMU and Express trains in Adra division. 2. Bring back all the express and passenger trains that were cancelled in Adra division during ZBTT 2020. People are suffering due to lack of trains. 3. Start the Bowaichandil-Khana New line project immediately, as 90% of the land is already available with SER. 4. Extend the Aranyak exp to Bokaro and make timetable changes based on suggestions from locals. 5. Restore the Bokaro-Asansol MEMU train cancelled due to Covid. The Bankura MP from BJP made a fake promise on Facebook to restore the train before the election, but it was just a bluff that cost him votes in the end.