Why the section between Saharanpur to Lucknow via Moradabad Bareilly Shahjahanpur Balmau is still having MPS of 100 kmph although the route is in plain region of Western Uttar Pradesh.
Even some single line routes are having MPS of 110 kmph .
I...
more... couldn't able to understand why NR is not interested in upgrading this section to 130 as most of the trains are LHB fied even Rajdhani, AC SF type trains were running on this route. Any idea on this? Also in Google maps I see there are still many many railway crossings on this route(some even on State Highway) but still not converted as Subway or Bridge. Any idea on this?
Surely this section needed to be upgraded to 130 mps lekin kya hua abhi tak iss par koi kadam nahi uthaya.
Please give your opinions.
please wait...Translate to EnglishYo why is the section from Saharanpur to Lucknow through Moradabad Bareilly Shahjahanpur Balmau stuck at a speed limit of 100 kmph even though it's a flat area in Western Uttar Pradesh? Some single line routes are even going at 110 kmph, man! I don't get why the NR ain't interested in upgrading this section to 130 when most of the trains running here are fancy LHB Rajdhani and AC SF types. Any clue on that? Also, on Google maps, I see mad railway crossings on this route, some even on State Highway, but they still haven't built no subways or bridges. Whatsup with that? This section definitely needs an upgrade to 130 mph, but damn, no one seems to be doing anything about it. What do you think, man?
please wait...Translate to HindiKyun Saharanpur se Lucknow tak via Moradabad Bareilly Shahjahanpur Balmau wala section ab bhi 100 kmph ki speed limit rakha hua hai jabki yeh route Western Uttar Pradesh ke plains mein hai. Kuch single line routes bhi 110 kmph ki speed limit par hain.
Mujhe samajh nahi aa raha ki NR kyun is section ko 130 tak upgrade karne mein interested nahi hai jabki zyadatar trains LHB fied hain, Rajdhani aur AC SF type trains is route par chal rahi hain. Kuch idea hai is baare mein? Aur Google Maps mein dekhta hoon ki is route par ab bhi bahut saare railway crossings hain (kuch State Highway par bhi) par woh abhi bhi Subway ya Bridge mein convert nahi kiye gaye hain. Kuch idea is baare mein?
Yeh section bina shak 130 mps tak upgrade hona chahiye tha par kyun ab tak koi action nahi liya gaya.
Apni ray dena.