By seeing the timings and distances the actual running will be DMM 1730 YGTL 2110/30 NDL 2400 GNT 500 Vja 600 and can reach MTM by 800. They have given lot of slack from GNT to MTM which is unnecessary. It looks like to utilise loco pilot driving hours shift.