CRS done on Shahganj jn to kheta Sarai double line track on 27/2/2023, Admin sir please change the Atlas to double line electrified.
please wait...Translate to Hindi27/2/2023 ko Shahganj jn se Kheta Sarai ke double line track par CRS ka kaam ho chuka hai, Admin sir kripaya Atlas ko double line electrified mei badal dijiye.