** If IR could commission newly laid second line from Bhalwani to Bhigwan (54 kms) in single stretch, it would lead to fully double CSTM-Seunderabad/ Chennai routes. With this, Golden Quadrilateral (+diagonals) shall be fully doubled
** Further only 50 km stretch around Solapur of above routes needs to be electrified for complete electrification. With this, Golden Quadrilateral (+diagonals) shall be fully doubled & Electrified
please wait...Translate to EnglishIf IR could get the new 2nd line from Bhalwani to Bhigwan (54 kms) all at once, then the CSTM-Seunderabad/Chennai routes will be completely doubled. That means the Golden Quadrilateral (+diagonals) will be doubled. Also, only about 50 km around Solapur needs to be electrified to fully electrify the routes. That way, the Golden Quadrilateral (+diagonals) will be fully doubled and electrified.