This is lack of coordination and joint inspection about feasibility of changing loco before issuing order. I understand that change of loco diesel to e loco at any location enroute is not as easy at change of driver in bus. there need to be sufficient infrastructure loco trip shed, loco pilots availability for hauling different types of locos, adjustment of loco manhours for effective utilisation in sections both sides.