There were lot of reports that Ghosi's status of a crossing station to be degraded as Halt and some protest kind of activity were also taken place.
This is to inform that all those reports were wrong and station is being developed as full fledged station with 2 loop & 1 main line, 2 full length platforms, 1 FOB, new station building etc.
Pls...
more... check these latest pics from my recent visit to the station.
Pic 1, 2 4 : New Platforms
Pic 3 : Station Board
The only confusion is that total 3 tracks to laid but the space left between Pf 1 and 2 is enough for 4 tracks can be laid.....