Kolkata Metro: হাতে আর মাত্র দু'দিন! তারপরই বেলেঘাটা ও রুবি মেট্রোর মধ্যে পুরোপুরি ট্রায়াল রান শুরুThe Kolkata Metro's extension from Ruby to Beleghata is nearing completion. Trial runs and safety checks are currently underway, with full trial runs scheduled to begin on Saturday, April 27th. The Commissioner of Railway Safety has inspected the line and suggested adjustments. The line will extend the existing Metro service from...
more... New Garia to Ruby, increasing the total length of the Orange Line to 30 kilometers. Five new stations will be added: VIP Bazaar, Ritwik Ghatak, Barun Sengupta (near Science City), and Beleghata. The Beleghata to Ruby section of the Orange Line will connect New Garia to the Airport.
Kolkata Metro ka Ruby se Beleghata tak extension almost complete ho gaya hai. Trial runs aur safety checks chal rahe hain, aur 27 April, Saturday se full trial runs shuru honge. Commissioner of Railway Safety ne line check kiya aur kuch adjustments suggest kiye hain. Ye line New Garia se Ruby...
more... tak ki existing Metro service ko extend karega, aur Orange Line ki total length 30 kilometers ho jayegi. Five new stations add honge: VIP Bazaar, Ritwik Ghatak, Barun Sengupta (Science City ke pass), aur Beleghata. Beleghata se Ruby section Orange Line ko New Garia se Airport tak connect karega.