The twin engines were removed within minutes. The electric loco was immediately started. But was kept waiting in loop line for ~40 minutes. After being connected, for more than 30 mns it had to wait for green signal.
Bhai, lambi train hai +slope gradient bhi hai bahut jyada , between Chopan and Chunar....(its called rajghat of I remember correctly)